PROCESSING PLANTLEACH PADSTOCKPILECRUSHER23°41'S 118°22'ESEAM CONCESSION AREA · SCALE 1:25,000Q1 2026
SEAM MINERALS · LATERITE MN OPERATIONS · SEMI-ARID BASIN

Proven
Reserves.
Delivered.

Battery-grade and steel-grade manganese processed at mine gate. Open-pit laterite extraction with full JORC 2012 resource classification and quarterly reserve updates.

PROVEN RESERVES
UPDATED Q1 2026
247.3
MILLION TONNES
38.4%
AVG MN GRADE
18.2 Mt
ANN. CAPACITY
34 yr
MINE LIFE
JORC
2012 COMPLIANT
MEASURED
142.1 Mt
INDICATED
105.2 Mt
JURISDICTIONWESTERN AUSTRALIA
DEPOSIT TYPELATERITE / SUPERGENE
PROCESSINGHYDROMET + HPMS
PRODUCTSMnSO₄ · EMD · SiMn
LOGISTICSMINE GATE → PORT HEDLAND
CERTIFICATIONISO 9001 · ISO 14001
SECTION 01 · ORE INTELLIGENCE

Grade Distribution
& Deposit Profile

MN GRADE DISTRIBUTION HISTOGRAM
Total Resource: 247.3 Mt · JORC 2012
DRILLHOLE DATABASE: 2,847 INTERVALS
BATTERY-GRADE RESOURCE
146.8 Mt
≥38% Mn · MEASURED + INDICATED
STEEL-GRADE RESOURCE
87.6 Mt
32–38% Mn · MEASURED + INDICATED
STRIP RATIO
1.4 : 1
WASTE TO ORE · OPEN PIT
PEAK GRADE INTERCEPT
52.3% Mn
SINGLE DRILLHOLE · 18m @ 52.3% Mn
COMPOSITE ELEMENT PROFILE · DEPTH VS GRADE
Average of 847 vertical drillholes · 5m composite intervals
Mn%
Fe%
Al₂O₃%
SiO₂%
SECTION 02 · PRODUCTION & OFFTAKE

Production Tonnage
& Capacity Utilisation

22.5 Mt
FY2025 ORE MINED
9.57 Mt
FY2025 PRODUCT
94.2%
CAPACITY UTIL.
QUARTERLY ORE MINED & PRODUCT SHIPPED
Q1 2023 – Q4 2025 · Million Tonnes
ORE MINED
PRODUCT
TARGET
CURRENT QUARTER PACE
6.2
Mt / quarter
VS TARGET 5.0 Mt+24%
PROCESSING RECOVERY
MnSO₄ RECOVERY
91.4%
EMD RECOVERY
88.2%
SIMN YIELD
94.7%
UPTIME
96.1%
CASH OPERATING COST
US$124
PER TONNE PRODUCT · CIF PORT HEDLAND
MINING$44/t
PROCESSING$62/t
G&A + LOGISTICS$18/t
OFFTAKE CAPACITY VS COMMITTED VOLUME · kt/yr
2026 Annual Contracted Volume by Product Stream
CAPACITY
COMMITTED
AVAILABLE
MnSO₄ (Battery)
360kt
COMMITTED
60kt
AVAILABLE
EMD (Battery)
120kt
COMMITTED
60kt
AVAILABLE
SiMn (Steel)
480kt
COMMITTED
160kt
AVAILABLE
HCFeMn (Steel)
200kt
COMMITTED
120kt
AVAILABLE
SECTION 03 · PRODUCT SPECIFICATIONS

Technical
Data Sheets

BATTERY-GRADE
MnSO₄·H₂O
Manganese Sulphate Monohydrate
MnSO₄·H₂O · LMNO / NMC CATHODE PRECURSOR
END-USE APPLICATIONS
NMC 811 PrecursorNMC 622 PrecursorLMNO CathodeLMO CathodeMn-Rich NMC
CERTIFICATIONS & COMPLIANCE
ISO 9001:2015
REACH Compliant
RoHS Compliant
IATF 16949
CHEMICAL & PHYSICAL SPECIFICATIONS
PARAMETER
TYPICAL VALUE
UNIT
METHOD
Mn Content
31.8
%
MIN 31.5%
Fe Content
≤0.0005
%
ICP-OES
Ca Content
≤0.005
%
ICP-OES
Pb Content
≤0.0002
%
ICP-MS
Ni Content
≤0.001
%
ICP-OES
Co Content
≤0.001
%
ICP-OES
Moisture
≤0.3
%
AT 105°C
D50 Particle Size
80–120
μm
LASER DIFFRACTION
Bulk Density
1.05–1.15
g/cm³
TAPPED
pH (5% Solution)
4.5–6.5
AT 25°C
PACKAGING1,000 kg FIBC / 25 kg HDPE BAG
MIN ORDER500 TONNES
INCOTERMFOB PORT HEDLAND / CIF
LEAD TIME6–8 WEEKS EX-STOCK
PRODUCT STREAM OVERVIEW
PRODUCTCHEMISTRYMN%PURITYAPPLICATIONANNUAL CAPACITYAVAILABLE VOL.
MnSO₄·H₂O
Battery31.8%99.5%+NMC / LMNO420 kt/yr60 kt/yr
EMD
Battery≥91.5%≥99%Primary Battery180 kt/yr60 kt/yr
SiMn (6517)
Steel65–68%Mill CertBOF / EAF640 kt/yr160 kt/yr
HCFeMn
Steel74–78%Mill CertAlloy Steel320 kt/yr120 kt/yr
SECTION 04 · ESG & LOGISTICS

Rehabilitation Metrics
& Pit-to-Port Routing

NDVI REHABILITATION INDEX · DISTURBED VS REHABILITATED AREA
% of Disturbed Area by Status · Annual Survey
ACTIVE DISTURB.
REHABILITATED
NDVI SCALE
BAREDENSE VEG
ESG PERFORMANCE SCORECARD
FY2025 · Self-Assessed + Third-Party Verified
WATER RECYCLED
94%
REHAB RATE
87%
GHG INTENSITY
0.34 tCO₂/t
LOCAL HIRE
78%
LOGISTICS ROUTING · PIT TO PORT HEDLAND BULK TERMINAL
OPEN PIT
SEAM CONCESSION
0 km
PRIMARY CRUSH
ON-SITE FACILITY
0.8 km
HYDROMET PLANT
MINE GATE PROCESSING
1.2 km
PRODUCT STOCKPILE
MINE GATE STORE
1.4 km
HAUL ROAD
SEALED MINE ROAD
42 km
RAIL SIDING
PILBARA RAIL LINK
220 km
PORT HEDLAND
BULK EXPORT TERMINAL
420 km
PARTNERSHIP & OFFTAKE

Request
Offtake Terms

Seam is currently contracting 2026–2030 offtake for battery-grade MnSO₄ and steel-grade SiMn. Annual volume commitments from 500 tonnes to full stream allocation. Incoterm flexible: FOB Port Hedland, CIF, or DDP.

MINIMUM TERM1 YEAR
PRICE REFERENCECIF CHINA + PREMIUM
PAYMENT TERMSLC AT SIGHT / TT 30
FIRST SHIPMENTQ3 2026
DOWNLOAD TECHNICAL DATA SHEET

Full product specifications, assay certificates, and process flow diagrams. No commitment required.

OFFTAKE INQUIRY FORM · CONFIDENTIAL